Exfo FTB-8500 Series for FTB-200 Uživatelský manuál Strana 77

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 513
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 76
Ethernet and Fibre Channel Application 63
6 Creating and Starting a
Test Case
A test case can be created using one of the following methods:
Test Setup allows the creation of the test case by travelling through the
signal structure. See Introducing the Test Setup on page 63.
See Test Case Availability to determine the test cases supported by the
unit.
Load allows setting up the test case by loading a previously saved
configuration. Open on page 36 for more information.
Introducing the Test Setup
The Test Setup window is displayed by default when the SUI is started. In
the case where the SUI is not in the test setup window, press the Test
Setup button from the Global Test Status and Controls on page 41.
Zobrazit stránku 76
1 2 ... 72 73 74 75 76 77 78 79 80 81 82 ... 512 513

Komentáře k této Příručce

Žádné komentáře