Exfo FTB-8500 Series for FTB-500 Uživatelský manuál Strana 23

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 544
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 22
Ethernet and Fibre Channel Application 9
3 Getting Started
If the Ethernet and Fibre Channel Application has been purchased at the
same time as the FTB-500, the Ethernet and Fibre Channel Application
module is pre-installed with the appropriate /ToolBox software version.
ToolBox Installation
ToolBox is the baseline software and thus needs to be installed on the
FTB-500 before using the Ethernet and Fibre Channel Application module.
Note: Refer to the FTB-500 platform user guide for more information on ToolBox
installation procedure.
Inserting and Removing Test Modules
Note: Refer to the FTB-500 platform user guide for more information on how to
insert a module into the FTB-500 or to remove a module from the FTB-500.
Turning the Unit On
Turn on the FTB-500. Refer to the FTB-500 platform user guide for more
information.
CAUTION
Never insert or remove a module while the FTB-500 is turned on.
This will result in immediate and irreparable damage to both the
module and unit.
WARNING
When the laser safety LED ( ) is flashing on the FTB-500, at least
one of your modules is emitting an optical signal. Please check all
modules, as it might not be the one you are currently using.
Zobrazit stránku 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 543 544

Komentáře k této Příručce

Žádné komentáře